The constructed hangar of metal structures is designed for the production of metal elements. The hangar design included the construction of production premises and the establishment of the administrative area  on two floors with the arranged premises for the workshop employees, accounting staff, engineers and the workshop management. 

The project implementation works were started with the design works. During the design process, according to the customer's order, the PICHE task was to place the production building with the administrative body in the relatively dense, overbuilt territory. During the metal frame design, the PICHE specialists took into account the hoists deployed in the hangar, their impact on metal structures, as well as 2nd floor existence and the dimensions of the hangar which were restricted by the building area. In light of the above mentioned, PICHE  developed the optimal project which was of high quality and cost-optimal to allow the customer to implement this project. Thus, taking into account the possibilities of  PICHE within the framework of the BIM (Building Information Modeling) system, in a 3D design, optimal planning was created, evaluating all the customer's requirements and providing appropriate construction costs for the customer.

During the hangar construction process, PICHE performed the works from zero cycle: assembly of metal structures, wall construction, roof construction, as well as all other works in accordance with the contract concluded with the general contractor. The contract determined full responsibility for the project from the start of planning and design to the completion of the hangar construction works, providing the performance and control of all the related works. 

After the completed project, PICHE expressed the customer wishes for further growth and development, as well as expressed the hope that in the near future, the customers will have the need for additional hangars of metal structure frame.

Were you interested in this project? You can read more about our competence and offered services here: Competitive advantages of PICHE

Insulated steel frame building
Production workshop design
Steel frame building
Industrial steel construction building
Metal frame industrial workshop
Warehouse constructions indoor